Erscheinungsdatum | Titel | Autor(en) |
1995 | Parallel Machines | Brucker, Peter |
2001 | Parallel Machines | Brucker, Peter |
2004 | Parallel Machines | Brucker, Peter |
2023 | Pathogenesis and Diagnosis of Proximal Hamstring Tendinopathies | Schroeter, Sarah; Heiss, Rafael; Hammer, Christian Manfred; Best, Raymond; Brucker, Peter; Hinterwimmer, Stefan; Grim, Casper; Engelhardt, Martin; Hotfiel, Thilo |
2011 | Personnel scheduling: Models and complexity | Brucker, Peter; Qu, Rong; Burke, Edmund |
1999 | Preemptive job-shop scheduling problems with a fixed number of jobs | Brucker, Peter; Kravchenko, Svetlana A.; Sotskov, Yuri N. |
1995 | Proceedings of the workshop on Discrete algorithms | Brucker, Peter; Hammer, Peter L. |
2002 | Project Scheduling under Limited Resources: Models, Methods and Applications. Sönke Hartmann, Springer, Berlin. ISBN 3‐540‐66392‐4 | Brucker, Peter |
2012 | Resource-Constrained Project Scheduling | Brucker, Peter; Knust, Sigrid |
1994 | Scheduling and Flexible Manufacturing | Brucker, Peter |
2008 | Scheduling jobs with equal processing times and time windows on identical parallel machines | Brucker, Peter; Kravchenko, Svetlana A. |
2011 | Scheduling Models | Brucker, Peter; Knust, Sigrid |
1998 | Scheduling: Theory and Applications | Brucker, Peter |
2001 | Shop Scheduling Problems | Brucker, Peter |
1996 | Single machine batch scheduling to minimize the weighted number of late jobs | Brucker, Peter; Kovalyov, Mikhail Y. |
1995 | Single Machine Scheduling Problems | Brucker, Peter |
1995 | Some Problems in Combinatorial Optimization | Brucker, Peter |
1999 | Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem | Baar, Tonius; Brucker, Peter; Knust, Sigrid |
1998 | Tabu-search for the multi-mode job-shop problem | Brucker, Peter; Neyer, Jürgen |
2007 | The complexity of mean flow time scheduling problems with release times | Baptiste, Philippe; Brucker, Peter; Chrobak, Marek; Durr, Christoph; Kravchenko, Svetlana A.; Sourd, Francis |