Erscheinungsdatum | Titel | Autor(en) |
2015 | Complexity results for flow shop problems with synchronous movement | Waldherr, Stefan ; Knust, Sigrid |
2017 | Decomposition algorithms for synchronous flow shop problems with additional resources and setup times | Waldherr, Stefan ; Knust, Sigrid |
2018 | Flow shop scheduling with flexible processing times | Bultmann, Matthias ; Knust, Sigrid ; Waldherr, Stefan |
2015 | Message scheduling for real-time interprocessor communication | Waldherr, Stefan ; Knust, Sigrid ; Aust, Stefan |
2017 | Open Shop Scheduling with Synchronization | Weiss, C.; Waldherr, S. ; Knust, S. ; Shakhlevich, N. V. |
2015 | Scheduling of flow shops with synchronous movement | Waldherr, Stefan |
2019 | Shop scheduling problems with pliable jobs | Knust, S. ; Shakhlevich, V, N.; Waldherr, S. ; Weiss, C. |
2016 | Solution algorithms for synchronous flow shop problems with two dominating machines | Kampmeyer, Matthias ; Knust, Sigrid ; Waldherr, Stefan |
2017 | Synchronous flow shop problems: How much can we gain by leaving machines idle? | Waldherr, Stefan ; Knust, Sigrid ; Briskorn, Dirk |
2018 | Synchronous flow shop scheduling with pliable jobs | Bultmann, Matthias ; Knust, Sigrid ; Waldherr, Stefan |
2016 | The assignment problem with nearly Monge arrays and incompatible partner indices | Weiss, C.; Knust, S. ; Shakhlevich, N. V.; Waldherr, S. |
2015 | The bottleneck transportation problem with auxiliary resources | Waldherr, Stefan ; Poppenborg, Jens; Knust, Sigrid |
2014 | Two-stage scheduling in shelf-board production: a case study | Waldherr, Stefan ; Knust, Sigrid |