FB 06 - Mathematik/Informatik

Organization name
FB 06 - Mathematik/Informatik
Parent OrgUnit
City
Osnabrück
Country
Germany

OrgUnit's Researchers publications
(Veröffentlichung der Organisationseinheit)

Aktive Filter:
Person:  Knust, S.

1-20 von 80

ErscheinungsdatumTitelAutor(en)
119992 Solving Large-Sized Resource-Constrained Project Scheduling ProblemsBrucker, Peter; Knust, Sigrid 
21998A branch and bound algorithm for the resource-constrained project scheduling problemBrucker, P; Knust, S ; Schoo, A; Thiele, O
32000A branch-and-bound algorithm for the resource-constrained project scheduling problemBrucker, P.; Knust, S. ; Schoo, A.; Thiele, O.
42015A CLASSIFICATION SCHEME FOR INTEGRATED STAFF ROSTERING AND SCHEDULING PROBLEMSPaul, Mareike; Knust, Sigrid 
52016A flow-based tabu search algorithm for the RCPSP with transfer timesPoppenborg, Jens; Knust, Sigrid 
62000A linear programming and constraint propagation-based lower bound for the RCPSPBrucker, P; Knust, S 
72019A neutrality-based iterated local search for shift scheduling optimization and interactive reoptimizationMeignan, David ; Knust, Sigrid 
82013A note on ``event-based MILP models for resource-constrained project scheduling problems''Artigues, Christian; Brucker, Peter; Knust, Sigrid ; Kone, Oumar; Lopez, Pierre; Mongeau, Marcel
92003A polynomial algorithm for P vertical bar p(j)=1, r(j), outtree vertical bar Sigma C-jBrucker, P; Hurink, J; Knust, S 
102015A Review and Taxonomy of Interactive Optimization Methods in Operations ResearchMeignan, David ; Knust, Sigrid ; Frayret, Jean-Marc ; Pesant, Gilles ; Gaud, Nicolas 
111999A tabu search algorithm for scheduling a single robot in a job-shop environmentHurink, Johann L.; Knust, Sigrid 
122002A tabu search algorithm for scheduling a single robot in a job-shop environmentHurink, J; Knust, S 
132012Algorithms and ComplexityBrucker, Peter; Knust, Sigrid 
142006Balanced home-away assignmentsKnust, Sigrid ; von Thaden, Michael
152012Complex Job-Shop SchedulingBrucker, Peter; Knust, Sigrid 
162012Complex scheduling, second editionBrucker, P.; Knust, S. 
172015Complexity results for flow shop problems with synchronous movementWaldherr, Stefan ; Knust, Sigrid 
182004Complexity results for flow-shop and open-shop scheduling problems with transportation delaysBrucker, P; Knust, S ; Cheng, TCE; Shakhlevich, NV 
192005Complexity results for flow-shop problems with a single serverBrucker, P; Knust, S ; Wang, GQ
202002Complexity results for parallel machine problems with a single serverBrucker, P; Dhaenens-Flipo, C; Knust, S ; Kravchenko, SA; Werner, F