FB 06 - Mathematik/Informatik

Organization name
FB 06 - Mathematik/Informatik
Parent OrgUnit
City
Osnabrück
Country
Germany

OrgUnit's Researchers publications
(Veröffentlichung der Organisationseinheit)

Aktive Filter:
Person:  Knust, S.
Schlagwort:  Engineering

1-15 von 15

ErscheinungsdatumTitelAutor(en)
12013A note on ``event-based MILP models for resource-constrained project scheduling problems''Artigues, Christian; Brucker, Peter; Knust, Sigrid ; Kone, Oumar; Lopez, Pierre; Mongeau, Marcel
22002Complexity results for parallel machine problems with a single serverBrucker, P; Dhaenens-Flipo, C; Knust, S ; Kravchenko, SA; Werner, F
32014In Memoriam Peter BruckerBein, Wolfgang; Hurink, Johann; Knust, Sigrid 
42009Minimizing costs in round robin tournaments with place constraintsKnust, Sigrid ; Luecking, Daniel
52017MIP-based approaches for robust storage loading problems with stacking constraintsLe, Xuan Thanh; Knust, Sigrid 
62012Online scheduling of flexible job-shops with blocking and transportationPoppenborg, Jens; Knust, Sigrid ; Hertzberg, Joachim 
72017Open Shop Scheduling with SynchronizationWeiss, C.; Waldherr, S. ; Knust, S. ; Shakhlevich, N. V.
82019Shop scheduling problems with pliable jobsKnust, S. ; Shakhlevich, V, N.; Waldherr, S. ; Weiss, C.
92016Solution algorithms for synchronous flow shop problems with two dominating machinesKampmeyer, Matthias ; Knust, Sigrid ; Waldherr, Stefan 
102021Solution approaches for storage loading problems with stacking constraintsOelschlaegel, Tobias; Knust, Sigrid 
112013Tabu search and lower bounds for a combined production-transportation problemCondotta, Alessandro; Knust, Sigrid ; Meier, Dimitri; Shakhlevich, Natalia V. 
122020The exponential multi-insertion neighborhood for the vehicle routing problem with unit demandsBuckow, Jan-Niklas; Graf, Benjamin; Knust, Sigrid 
132023The warehouse reshuffling problem with swap movesBuckow, Jan-Niklas; Knust, Sigrid 
142023The warehouse reshuffling problem with swap moves and time limitBuckow, Jan-Niklas; Knust, Sigrid 
152014Two-stage scheduling in shelf-board production: a case studyWaldherr, Stefan ; Knust, Sigrid